Clover Mill crossing replacement over a small tributary of the is nearing completion.
Metal arch installation was completed last week right before remnant hurricane rains swept through. Only about an inch of rain and the flows have already receded to a small trickle but stream flow is naturally moving through the road crossing, achieving a major goal to restore fish passage and aquatic conditions. Also can note the shelf along the re-built stream banks to facilitate wildlife crossing.
The crew is now working to rebuilt the road base and guardrails will also be installed for safety protection.